The Hong Kong Polytechnic University Phase 8
poly8

Chatham Road South & Princess Margaret Road, Kowloon

Description:

Structural, geotechnical and civil engineering for Phase 8 development of HKPU. The largest campus development since the initial campus development, this is a $1,200M project including a vehicular tunnel under Chatham Road, a multiple use campus for the 4-year program additional students and basement car parking and loading unloading area. The site also has to accommodate two railing tracks for the Shatin Central Railway Line with large clear span for the trains.

Client:
Hong Kong Polytechnic University


Year:
2008-2013

Involvement:
Structural, Geotechnical and Civil Engineering Consultant


Tiu Keng Leng Sports Centre and Public Library

No. 2 Chui Ling Road, Tseung Kwan O

Description:

The project is a multi-purpose complex, which comprise a library, a sports centre, recreational facilities and a district open space located at Area 74 Tseung Kwan O. Part of the site also lies within the MTR Tseung Kwan O reserve zone. Driven H-pile has been adopted to achieve the most cost effective foundation system. Extra precaution and consideration have been given to control piles vibration immediate adjacent to the MTR protective zone and operation noise to nearby noise sensitive receivers (school and residential estate).

The sport complex requires large span roof structure spanning 41m across the short span of the open hall. Steel truss with an inverted triangular box formed by three circular hollow sections with structural depth of 2.6m is used for the roof system.

Client:
Architectural Services Department

Year:
2008-2013

Involvement:
Structural, Geotechnical and Civil Engineering Consultant



VTC International Cuisine College

No. 141 Pokfulam Road. HK

The project covers the construction of a new building for the ICC, together with ancillary works outside the site boundary.

The development site is located at the No. 141 Pokfulam Road, Hong Kong. It is generally in rectangular shape enclosed by Pokfulam Road, existing historical buildings Wellcome Theatre and the Old Dairy Farm Main Office, and the existing VTC Pokfulam Training Centre (Chinese Cuisine Training Institute). The total area of the site is about 3,800m2.

The new building will be 6 storeys reinforced concrete building with 2 levels of basement. Net operating floor area (NOFA) will be 6,700 m2 approximately and construction floor area (CFA) will be about 12,500 m2.

The ancillary works outside the site boundary consist of re-alignment of the access road to the new building and construction of a new tunnel linking the VTC Pokfualm Complex. The building works will involve the excavation and lateral support by pipe pile for basement and footing foundation construction, soil and rock excavation, the construction of a 20m-span concrete road bridge and a box-section tunnel.

Client:
Vocational Training Council

Year:
2012-Present

Involvement:
Structural, Geotechnical and Civil Engineering Consultant