The Hong Kong Polytechnic University Phase 8
|
|
|
Chatham Road South & Princess
Margaret Road, Kowloon
Description:
Structural, geotechnical and
civil engineering for Phase 8
development of HKPU. The largest
campus development since the
initial campus development, this
is a $1,200M project including a
vehicular tunnel under Chatham
Road, a multiple use campus for
the 4-year program additional
students and basement car
parking and loading unloading
area. The site also has to
accommodate two railing tracks
for the Shatin Central Railway
Line with large clear span for
the trains.
Client:
Hong Kong Polytechnic University
Year:
2008-2013
Involvement:
Structural, Geotechnical and
Civil Engineering Consultant
|
Tiu Keng Leng Sports
Centre and Public Library
|
|
No. 2 Chui Ling
Road, Tseung Kwan O
Description:
The project is a multi-purpose
complex, which comprise a
library, a sports centre,
recreational facilities and a
district open space located at
Area 74 Tseung Kwan O. Part of
the site also lies within the
MTR Tseung Kwan O reserve zone.
Driven H-pile has been adopted
to achieve the most cost
effective foundation system.
Extra precaution and
consideration have been given to
control piles vibration
immediate adjacent to the MTR
protective zone and operation
noise to nearby noise sensitive
receivers (school and
residential estate).
The sport complex requires large
span roof structure spanning 41m
across the short span of the
open hall. Steel truss with an
inverted triangular box formed
by three circular hollow
sections with structural depth
of 2.6m is used for the roof
system.
Client:
Architectural Services
Department
Year:
2008-2013
Involvement:
Structural, Geotechnical and
Civil Engineering
Consultant
|
VTC International Cuisine College
|
|
No. 141 Pokfulam
Road. HK
The project covers the
construction of a new building
for the ICC, together with
ancillary works outside the site
boundary.
The development site is located
at the No. 141 Pokfulam Road,
Hong Kong. It is generally in
rectangular shape enclosed by
Pokfulam Road, existing
historical buildings Wellcome
Theatre and the Old Dairy Farm
Main Office, and the existing
VTC Pokfulam Training Centre
(Chinese Cuisine Training
Institute). The total area of
the site is about 3,800m2.
The new building will be 6
storeys reinforced concrete
building with 2 levels of
basement. Net operating floor
area (NOFA) will be 6,700 m2
approximately and construction
floor area (CFA) will be about
12,500 m2.
The ancillary works outside the
site boundary consist of
re-alignment of the access road
to the new building and
construction of a new tunnel
linking the VTC Pokfualm
Complex. The building works will
involve the excavation and
lateral support by pipe pile for
basement and footing foundation
construction, soil and rock
excavation, the construction of
a 20m-span concrete road bridge
and a box-section tunnel.
Client:
Vocational Training Council
Year:
2012-Present
Involvement:
Structural, Geotechnical and Civil Engineering Consultant
|
|